Wednesday, February 18, 2009

Topcon Stakeless Grading

PennDOT Prepares GPS Usage Specs

A much-watched airport access road project provides a golden opportunity to examine the technology in action.

Edited by Matthew Phair -- Constructioneer, 4/2/2007

The Pennsylvania Department of Transportation is in the middle of preparing specifications for using GPS technology that includes automated precision grading with bulldozers and motor graders. One of the PennDOT team members responsible for bringing the specifications to fruition is Thaddeus R. Mikolajczyk Jr., P.L.S., and chief of surveys. Mikolajczyk has been working closely with PennDOT Project Manager Brian Steffy, P.E., who is in charge of the DuBois-Jefferson County Regional Airport Access Road, a construction project where the use of GPS technology is under scrutiny by PennDOT.

When this access road project is completed, it will link the airport to I-80, four miles to the south. I-80 is the main northern tier interstate highway running from New Jersey to California. Since I-80 is an important freight-transport route, the new access road will not only enable many of the yearly 47,000 air passengers to have easier access to the airport but it should attract businesses and light industry to establish warehouses and light manufacturing facilities here. Hoping to entice businesses here, there is an industrial park next to the airport that is now under construction and is designated a Keystone Opportunity Zone, which carries tax-free privileges for the businesses. The park also is a Foreign Trade Zone 254 enabling businesses to delay paying import taxes until the productis sold.

From both PennDOT's and the project contractor's perspective, there is yet more significance to this road project than its link between the airport, the industrial park and I-80. This is a major PennDOT construction project where some of the latest GPS technologies for grading are being evaluated and documented. The results will assist PennDOT engineers and construction project managers to draw up final specifications on using GPS technology on future construction projects requiring precision grading.

Francis J. Palo, Inc. of Clarion, Pennsylvania, is the project contractor and has been instrumental in pioneering the use of GPS technology in the state. Palo recently made a substantial financial investment to purchase GPS equipment that was fitted on two of the company's bulldozers and two motor graders. Palo also has been influential with PennDOT by introducing some of the latest GPS technology to the department for their consideration when writing the new specifications.

Michael Palo, CEO of Palo Inc., and the president of Constructors Association for Western Pennsylvania, has been a strong advocate for new technology. He said, "You must be willing to take some risks if you are to move your company forward, and I find this new GPS technology is good not only for the contractor but good for Pennsylvania."

The technology Palo is talking about is known as stakeless grading. This stakeless approach includes both rough grading and precision grading on all phases of road construction. PennDOT not only approved the use of this technology for the airport access road project, but its project manager,Brian K. Steffy, P.E., has embraced it by working very closely with the contractor in all phases of the project.

The stakeless grading method used on this project is benefiting both parties. Palo's winning bid for the project is $16.7 million. The contractor started the project in October 2005. According to Palo's project manager, Sam Dennison, the project should be completed weeks earlier than the designated July 2007 completion date. Dennison attributes the shorter completion date, in part, to the faster grading operation made possible by the GPS technology.

The new two-lane road will be 5.2 miles long; its alignment is like that of a French curve where there is a multitude of irregular curves making up an overall arc form. This alignment was deemed the most economical and practical design for constructing the road. Much of the terrain in and around the alignment consists of rolling hills and low mountains, and despite building the road on this curved alignment to avoid the hills, there are still multiple high and low areas to deal with for reaching the wanted grades.

One-million cubic yards of ground is being excavated, including overburden and intact rock (approximately 200,000 cubic yards) that is drilled and blasted to fragment sizes 36-inch minus. Cuts along the alignment are to 60 feet deep and fills go to 60 feet high. About 700,000 cubic yards of the excavated materials is used for the fills. The extra 300,000 cubic yards of materials is exported from the project site. Slopes left on either side of the cuts and made by the fills are graded 2-1 by the two bulldozers fitted with GPS systems.

Here is a rundown of the different Topcon GPS components Palo is using to perform all rough and fine grading at this project. First, there is a HiPer+ wireless, integrated GPS receiver system, which is stationed on a pole at the airport. Since the project is located in the middle of mountains, Palo bought two Topcon Radio Repeaters in case they were needed to overcome signal interferences; however, it was later found the repeaters are not necessary for this project. Dennison hypothesizes since the road is being constructed in an arc (rather than a straight line) and the HiPer+ unit at the airport is relatively close to all points along the alignment, the radio repeaters were not needed. Actually, the farthest distance from the road to the HiPer+ is less than four miles. Depending on the terrain and canopy conditions, the HiPer+ has exceptional transmitting capabilities, as was demonstrated on a recent Pennsylvania Turnpike construction project where it emitted a strong signal that was received 13 miles away.

If there is a heart to the Topcon GPS System, it is the HiPer+. Important is its dual-constellation satellite tracking. The dual-constellation (GPS plus Glonass) tracking will provide 40 percent more satellite coverage than the more conventional GPS-only tracking systems. Notable also is the center-mounted RTK UHF antenna for boosting its RTK performance and distance without compromising the strength of its GPS signals. Additionally, the integrated 40-channel dual-frequency receiver features the integrated Bluetooth technology; it also features Co-Op Tracking technology for under-canopy performance.

There are two different types of control systems mounted on the bulldozers and motor graders. The Caterpillar D8T bulldozer has the 3Di-GPS+ Indicate Control System. This system carries with it a modest price tag and is suitable for rough grade applications, especially where substantial in situ ground is to be excavated, making shallow to deep cuts. Likewise, this system lends itself well for bulk filling and backfilling activities. This GPS system does not have automated control, so the operator is completely in charge of operating the bulldozer just as he is when operating the machine without the GPS indicate control. However, guesswork associated with traditional grading and back filling and the constant need of a grade foreman is eliminated, thus reducing grading time while achieving superior grading results.

Mounted on the Caterpillar models D5N bulldozer and the 120H motor grader, and a John Deere model 770 motor grader, are Topcon 3D-GPS+ automated control systems. The D5N bulldozer also is used for rough grading, but its grading procedure is automatically controlled, and with the base station in place the grading tolerances are within 0.1 foot or less. Precise location points are achieved by triangulation. This system tracks all available satellite signals, thus assuring greater solution quality and integrity.

With dual-constellation tracking capabilities and the optional Co-op Tracking System integrated with the 3D-GPS+ Control System, satellite tracking integrity is maintained (locked) when the bulldozer or motor grader is grading near or under canopies such as trees.

Added to the 3D-GPS+ Systems installed on the two motor graders is the optional Millimeter GPS™ System for an even more precise grading-control system. It enables the motor graders to automatically perform fine grading (measurable in millimeters) not readily reachable by using traditional staking or standard GPS methods.

On PennDOT projects, stakes are specified to be installed at 25-foot to 50-foot intervals along the complete length of a road alignment. This project called for 25-foot intervals for sub-grade and 50-foot intervals for the cuts and fills. Essentially, 10 to 20 stakes were avoided per 500 feet and all the survey work that goes with it.

Dennison says he is erring on the conservative side by making 500-foot intervals; there are sections along the alignment where the two PZL-1 transmitters could be spaced up to 900 feet apart yet get outstanding precision-grading results.

Palo constantly verifies all grading activities by monitoring the grades at random points with Topcon Pocket-3D FC-100 field controllers running their Pocket 3D software in concert with PZS-1 mounted on the range poles. Troy Wolfgang, survey technician, is in charge of this activity and Dale Zimmerman supervises it. Palo has four FC-100 units (includes field controller software).

The Rest of the Story

Keith Klingensmith, P.E., technical representative for Topcon's local Master Distributor, Productivity Products & Services, Inc., (PPS) of Saxonburg, Pennsylvania, was very instrumental from the onset in not only assisting the contractor on what Topcon equipment to select, but he also trained the company's personnel in how to use the equipment.

Klingensmith unwittingly gives a good testimony about the value he sees in Topcon GPS Systems by an important action he took. Upon learning the details about the system, he became so impressed with this futuristic technology made available for today's projects that he made a career change.

Klingensmith was a construction project engineer with PennDOT in District 12 for 15 years and was happy with his professional status at the department. About 2-1/2 years ago he accepted an invitation to witness a Topcon GPS Systems demonstration. A contractor who was building a box culvert on one of Klingensmith's projects was interested in learning about the system and invited Klingensmith to accompany him to the demonstration.

The demonstration was made by PPS. "They demo'ed the Topcon rover pole, and I was so impressed with its capabilities that I had an in-depth talk after the demonstration with the president of the company, David Reitmeyer. After our conversation, he suggested I should consider joining the company as a technical rep. I went home and talked it over with my wife; two weeks later I joined the company," said Klingensmith.

Seeing the Future: Stakeless?! by Leslie Paynor

(This is a great article on the perceived future of stakeless grading. I know from firsthand experience that stakeless grading is quickly becoming a reality. Left A. Fuzz )



As GPS machine control makes its way onto more surveying and construction sites, the question begs to be asked: who will provide the data--and how?


It’s almost as if Keith Rochester, RLS, PLS, can see the future. In 1983 he was one of the first to use an innovative 3D data design package now used for machine control. In 1986 he saw that the advancement of positioning technology, specifically the Global Positioning System (GPS) and robotic surveying technology, would rapidly change the face of construction and surveying, especially on larger construction staking jobs. And in 1999 he saw that 3D machine control would change it even more, potentially eliminating the need for construction staking. Rochester knew his company, Rochester & Associates (R&A) of Atlanta, Ga., would need to be part of the change--or get left behind. So he got on board: initially by investing in GPS and robotic surveying equipment, then by developing an innovative 3D data preparation service.

“I’ve always liked technology and envisioning the impact it will have,” says Rochester, founder and CEO of R&A. “I guess it’s just in my blood.”

That foresight has paid off. From its start as a one-man, home-based surveying shop in 1966, R&A has grown to be a multi-faceted civil engineering consulting firm with 190 employees and four offices in Georgia and one in the country of Turkey. Today, an increasing part of R&A’s business includes 3D data preparation, site calibration and training in support of blade and machine control technology.

“We saw a potential impact on our survey business from the application of automated technology,” says Darrell Rochester, PE, president of R&A and Keith’s son. “We quickly realized our primary product is the creation of buildable sets of electronic plans for our clients. We’re fully behind using 3D data because we think 3D just makes sense.”

Three-dimensional (3D) data is making sense to an increasing number of contractors and surveyors across the nation. Construction machine control systems--which put design surfaces, grades and alignments inside the cab--are becoming the wave of the future. More and more earthmovers, construction firms and DOTs today are depending on the advanced efficiencies, time savings and greater profits machine control can provide. And machine control depends on accurate 3D modeling to guide the blades, buckets, wheels and hoes to the precise position required. To see that, just look at some of the innovative firms using machine control today.


On the Construction Side

A road grader equipped with GPS machine control technology completes sub-grade prep work.
McAninch Corporation of Des Moines, Iowa, a Midwest earthmoving and underground utilities company, started using GPS in 1999 to verify topographical maps before bidding on projects. Topos they received could be off by as much as 5 ft in areas--and that could translate into lost time and money.

The company purchased an RTK GPS system, which paid for itself on just two jobs by finding topo errors. Founder and CEO Dwayne McAninch was impressed.

So when he heard GPS was available for machine control on heavy equipment, McAninch jumped on board in a big way. The first firm in the nation to deploy Trimble (Sunnyvale, Calif.) SiteVision GPS equipment on its scrapers, excavators and supervisor trucks, McAninch works closely with both Caterpillar of Peoria, Ill., the world’s largest manufacturer of construction and mining equipment, diesel and natural gas engines and industrial gas turbines, and Trimble on GPS machine control development. The company today boasts 35 SiteVision systems deployed on more than 50 scrapers, 58 dozers and 40 backhoes; they also have GPS on 15 supervisor trucks.

“GPS is revolutionizing the earthmoving industry,” McAninch says. “McAninch Corporation possesses a passion for innovation and is researching new and exciting ways to apply GPS technologies to the industry.”

For McAninch the choice to use GPS technology was simple: it provided his company with a fair competitive advantage. GPS machine control allows the company’s employees to be more productive and efficient from start to finish, which makes them more profitable. So much so, that the firm is planning to continue to upgrade its fleet of almost 400 pieces of equipment with GPS on-board guidance systems.

“Machine control helps insulate us and the consulting engineer from mistakes because we can identify any problems before we get onto the jobsite,” says Patrick Ruelle, director of business development at McAninch. “Machine control helps everyone look better in the client’s eyes. There are no surprises in a job; we know exactly how much earth we’re moving thanks to the technology.”

After the owner’s consulting engineer or surveyor sets survey control or 3D bench marks for the project, McAninch is often able to start immediately and get the job done with minimal construction staking; using GPS for site calibration, precision grading and checking, they’ve eliminated the need to wait on stakes and related scheduling issues.

“We integrated these GPS tools into our firm to cope with the workload and deal with the scheduling,” Ruelle says. “We can’t wait for site staking, so we’re intentionally taking risks. We don’t represent ourselves as expert surveyors or engineers--if we did it wrong, put the road in the wrong place by doing this, we’d be in trouble. But we take risks because, with this technology, mistakes such as that are difficult to make.

“It’s the difference between building houses with hand tools and power tools,” he says. “Today the question is how much more productive and efficient are you by using the tools you have?”


Small Company: Big Profits

No stakes are necessary to put the dirt on grade in the fill area and apply the appropriate compaction with this compactor outfitted with a GPS grade control system.
Small construction firms are also gaining from machine control. Rick Pinney Jr., ME, is president of LRS Excavating Corporation of Lansing, N.Y., a small contractor specializing in athletic field site development for school districts. In early 2000, LRS was awarded a $2 million school project that included eight athletic fields and a large detention pond. He purchased a SiteVision GPS system and a Trimble GPS Total Station 4700 system for use on his John Deere 750C, Cat D-8K and Case 550G dozers. After just six months on the project, Pinney realized a 4.5 percent profit increase, which easily paid for both systems.

A mechanical engineer, Pinney does much of the work himself. After the first year, Pinney also purchased Trimble’s Terramodel software for 3D data modeling and now does everything from data management and preparation to site calibration, stakeout and earthmoving.

“These tools are user-friendly; that’s why we can do it all,” he says. “It’s made us much more profitable and we can now bid bigger projects than in the past.”


What’s a Surveyor to Do?

Photo credit: Brad Kaye
So is there room in the 3D construction world for surveying, or is it making surveying for construction obsolete?

There is room--and demand--for surveyors in the 3D construction world, say contractors and progressive surveyors across the nation. From large surveying and civil engineering firms to small one-person survey shops, surveyors are finding a new and challenging world opening up to them--a world in which they become data managers, instrumental on project teams from start to finish, from construction staking to as-builts. Because machine control uses three dimensions--vertical, horizontal and elevation for precise location and grade--data must be available in 3D. And data must be accurate. Contractors often don’t want to carry the extra liability of site calibration, preparing data or managing data files and will look to others to do these tasks. Years ago, McAninch could find no one in their area with that capability, so they took it in-house. McAninch GPS division manager Tim Tometich, who has a construction engineering background, initially did all file and data prep; as the company expanded its use of GPS, however, it outsourced some of its file and data prep. And Pinney says either he or someone at his company will probably become licensed in the future. All of this opens new doors for progressive civil engineers and surveyors to be part of the 3D construction machine control world. Here’s how a few individuals and firms are doing the 3D data and walking through that open door today.


Doing the Data

David Reynolds, PS, survey manager for HLS Surveyors and Engineers in Vandalia, Ohio, had used GPS for surveying since 1999. After watching contractors increasingly invest in machine control equipment, Reynolds realized he needed the tools to prepare data for the new equipment if he wanted to be part of it. He did, and trained on data preparation services using Terramodel. Since then, Reynolds and HLS have provided 3D data prep for contractors in the greater Ohio area as well as in other areas in the Midwest.

Data prep clients come to HLS at all levels: Reynolds works on projects that provide only paper plan sets and require everything from reading the plans to converting the data into 3D models. He also gets projects that include digital data from the start, enabling faster completion.

To create 3D models of the build site, Reynolds uses several Computer-Aided Design (CAD) packages, including Autodesk (San Rafael, Calif.) Land Development Desktop, Eagle Point (Dubuque, Iowa) Civil Series and Trimble Terramodel. The 3D project files are then loaded into the office software to convert the files into machine-ready format. They can then be easily loaded into the machine control equipment using a flash memory card or PCMCIA card.

The goal of data prep is to do everything possible in the office to make it easy for the equipment operators. All the tools and information machine operators need to build a site is inside the cab; they simply follow the model created on the system’s in-cab computer screen. Gone are the days of hand signals and guess work. The seamless digital path from office to field makes for greater efficiency in the field--and fewer mistakes.

“Often the people who do quality control inspection are amazed at the ability of the machine control system to produce grades for the operator,” Reynolds says. “And they’re amazed at the machine’s ability to grade a site so close to the design without all the random grade stakes.”

But Reynolds believes the construction world won’t be completely stakeless. “A lot of staking can be eliminated using machine control,” he says, “but I don’t see machine control replacing 100 percent of staking. It’s more an additional tool to improve the efficiency and productivity of contractors.”


Construction and Surveying

Other surveyors are working on the construction side. Sandor Vegh, PS, has been surveying for more than 20 years. Today, he heads the GPS machine control division for Trucco Companies Inc., an Ohio construction firm in the city of Powell. Prior to hiring Vegh specifically to guide them into the machine control world 2 1⁄2 years ago, Trucco used surveyors strictly as project subcontractors. Today, the company employs three full-time surveyors: Vegh and two one-person crews. They’ve also hired an assistant for the surveyors as well as a full-time person to perform data prep.

Vegh hadn’t used GPS before getting into GPS machine control at another firm. But he was an immediate believer. A ‘technogeek,’ Vegh never questioned machine control’s ability to work after reading about the technology and seeing a demonstration on it.

Nor does he question the need for surveyors in the machine control world.

“By eliminating many unnecessary stakeout procedures, machine control puts surveyors in more of a quality control position,” Vegh says. “Surveyors are constantly needed to serve the GPS and robotic machine control systems as well as to set site control, evaluate control points, do site calibration or set additional control points for checking and further stakeout. To me, the surveyor now has time to do the more important things such as stakeout and quality control.”

Not all firms will follow the Ohio construction company’s lead, but it’s working for Trucco. After starting with one Trimble BladePro 3D system in 2001, Trucco now has 11 GPS systems for both dozers and compactors, as well as three GPS total stations and a robotic total station for the survey crews and foremen. And the company is planning to outfit almost all its equipment with GPS machine control.

“GPS machine control improves our efficiency and accuracy,” says Mark Trucco, CEO of Trucco Companies. “Profitability comes from how efficient and productive we are, so GPS machine control definitely impacts our bottom line.”

“I wouldn’t want to run my business without machine control,” he adds. “We like what it does for us.”

And for that, he has a surveyor to thank.


From Skeptic to Fan

Not all users are such instant believers. Some are skeptical--at least initially. One such skeptic was John Stone, PLS, GPS coordinator for River View Construction, an earthmoving company in Wausau, Wis. Before the firm's owners purchased their first machine control system, Stone did everything in his power to test the accuracy of the SiteVision grades. He set stakes to double-check the machine; he even used a conventional level to test it.

“I finally convinced myself it was doing such a good job I didn’t have to set stakes anymore,” he says.

He’s now an ardent user; River View today has five SiteVision systems on Komatsu (Komatsu North America, Vernon Hills, Ill.) dozers and another one that River View switches between its Caterpillar motor grader and a Sheep’s foot, or compactor.

“We’ve almost doubled the amount of jobs we can do in a year,” Stone says. “It cut down on our man-hours, work gets done quicker and we don’t have to set as many stakes.”

But while Stone plans all new jobs, does site calibration and grade checking, and oversees all the machine control equipment, he goes elsewhere for data prep--to another surveyor who has exchanged his rover for a mouse.


3D Data Prep and Surveying

For more than 15 years, Wisconsin’s David Renaud, RLS, ‘paid his dues,’ as he puts it, in good weather and bad, doing everything from boundary surveys to road topos. Today, Renaud is manager of the survey division of REI in Wausau, Wis., a civil and environmental engineering firm with three full-time survey crews. He now spends most of his time in the office.

Initially, Renaud did mainly map certification and survey computations. Since last year, however, he’s increasingly doing 3D data modeling for the firm’s growing list of clients using GPS machine control.

“I really enjoy it; it’s challenging to create the digital model accurately and correctly,” he says. “It may not be my design but it’s my work that makes this thing buildable.”

As construction 3D machine control use increases, more and more project developers and state agencies are including 3D data and at times machine control capabilities in their project specs, Renaud says. So he’s certain the demand for 3D modeling will expand.

“Machine control is definitely the wave of the future,” Renaud says. “This is the way the industry is going; whether it’s a surveyor or a CAD operator who will create these models, they will need to be created.”

It’s then up to the individual or firm to determine who that will be. The question really becomes: Will it be you?


Sidebar: Communicating Between Surveyors and Contractors

Surveyors who are technically proficient but lack good communication skills may have higher incidents of disputes and claims than surveyors who are less technically proficient but who cultivate professional relationships with their clients. Some clients are often simply unaware of the effort that the surveyor expends on their behalf.

Effective communication can be the answer to quickly resolving issues between surveyors and contractors. It is important in a surveyor-contractor relationship to identify who will be the appropriate decision makers. Often when a contractor retains a surveyor for a project, an outside party (such as the property owner), will attempt to direct the activities of the surveyor. This can create potential risks for the surveyor. Taking direction from another entity may put the surveyor in conflict with the surveyor’s obligations to the contractor and expose the surveyor to potential claims.

Another issue that often arises in the surveyor-contractor relationship is communicating the scope of services. The services required by a contractor are very different from the services required by a property owner. The surveyors and contractors involved in a project should effectively communicate and come to agreement on the scope of services. Statistics from CNA/Schinnerer’s (Chevy Chase, Md.) professional liability program indicate that the majority of claims against surveyors come from clients (60 percent), and a frequent source of those claims is unmet expectations. Complete communication between contractors and surveyors regarding the scope of services can help to avoid insurance claims.

The most common area that requires effective communication between the surveyor and contractor is the contract for professional services. Sometimes the contractor will ask the surveyor to sign an agreement that is the same agreement the contractor uses with trade subcontractors. Since these agreements have been drafted for construction activities, they are not appropriate for surveyor services. The contractor may ask the surveyor to sign such an agreement because the contractor fails to realize the distinction between the services of the surveyor and a trade subcontractor. Both the surveyor and the contractor should understand the particularities of each other's professional services and needs. It should also be understood that, under the law, surveyors are held to a professional standard of care while trade subcontractors must provide more stringent warranties and guarantees, which are excluded from most professional liability policies.

Each meeting or conversation between a surveyor and a contractor is a chance to hear the client’s concerns and to adjust the firm’s focus or performance to meet the client’s expectations and the goals for the project. Each meeting with the client is another opportunity for the surveyor and contractor to understand the scope of services, thus making the relationship successful.



Statements concerning legal matters are general observations and may not be relied upon as legal advice. All such matters should be reviewed with a qualified advisor.

With the help of Rochester & Associates' site calibration services, Shepherd Construction Co. of Atlanta, Georgia, grades sub-base with 3D GPS technology under a parking deck with close clearances. R&A strategically placed reflectors on the columns and underside of the deck beams.


Leslie Paynor
Leslie Paynor is a writer specializing in construction topics.

Monday, February 16, 2009

Civil 3D video

Here is a link to a Civil 3D video showing how to create a road corridor. Autocad is, in my opinion, a bit more long winded than the Trimble Terramodel application, but an extremely effective piece of software non the less.

Here is the link: http://www.youtube.com/watch?v=P4CCQAQ_EMg

Terramodel Cogo Video

I use Terramodel exclusively for data prep. It is very powerful and user friendly. Miles and miles of highway can be generated in a very short time. I highly recommend it.

Here is a link to a video showcasing the cogo commands in Terramodel.

http://www.youtube.com/watch?v=DxCpJAkgYoA

Trimble Gps Technology

Very interesting video, very similar to my own personal experiences with the Trimble GCS900 systems. Excellent equipment and excellent results. I have personally overseen several multi-mile State Highway projects with a very similar setup.

Set in Australia, here is the video link.

http://www.youtube.com/watch?v=CRzLSCVHD4I

Topcon Grade Control

I have used Trimble products for Grade control and have had excellent success with both the GPS systems and the robotic total systems. This video link is for Topcon's offering to the grade control market. It looks very impressive at first blush. As I get a little deeper into it, I will make a trimble vs topcon comparison based on my own personal experiences. The video link is:

http://www.youtube.com/watch?v=8S5AAyF9LCE

stock pile volumes

I have been a highway surveyor for 23 years and in that 23 years, I have had to shoot a lot of stockpiles for inventory volumes and so forth. Here is a Youtube video that outlines a Topcon Total Station that does exactly that and much more.

http://www.youtube.com/watch?v=f9ZInxCJX30

Followers

Blog Archive

About Me

I am a surveyor with over 30 years of experience in Land Surveying with an emphasis on Heavy and Highway construction layout. I am fluent in several different cadd systems including Terramodel, Microstation and Inroads, and land development desktop